Macspark Logo
MAC SPARK
Back to Insights
Fiber Checklist: Survey → Testing → Handover
Macrocon Oct 2025 • Fiber 12m

Fiber Checklist: Survey → Testing → Handover

Deployment Desk

A field-ready checklist for planning, trenching, laying, OTDR testing, and documentation handover.

Fiber QA OTDR

Survey

  • Route map + obstacles + permissions
  • Pole/duct availability + chamber points
  • Fiber count planning + spare capacity
  • Photos + GPS points + risk list

Deployment

  • Trenching/ducting + protection
  • Cable pulling/blowing + labeling
  • Splicing plan + closure installation
  • As-built updates daily

Testing & handover

  • OTDR traces + power meter results
  • Splice loss verification
  • Route diagram + BoQ + photo pack
  • Acceptance sign-off + escalation contacts